WIND ENERGY

The main wind energy projects in which ITA Group has been involved by various means of participation are;

Α. Operational Wind Farms in collaboration with private power producers

  • Wind Farm w/ installed capacity 36 MW at ‘Didyma’ site, Region of Peloponnsese for the project company AEOLIKI DIDYMA S.A. Procurement, installation supervision and electrical study for the erection of 12 wind turbines (WTs) VESTAS V90-3.0 ΜW
  • Wind Farm w/ installed capacity 26 MW at ‘Didymos Lofos’ site, Region of Thrace for the company TERNA ENERGY S.A. Procurement and installation supervision for the erection of 13 WTs VESTAS V80-2.0 ΜW
  • Wind Farm w/ installed capacity 30 MW at ‘ Mytoula’ site, Region of Thrace, for the company TERNA ENERGY S.A. Procurement and installation supervision for the erection of 15 WTs VESTAS V80-2.0 ΜW .
  • Wind Farm w/ installed capacity 17 MW at ‘Koryfi’ site, Region of Central Macedonia for the project company AEOLIKI SIDIROKASTRO S.A. Procurement and installation supervision for the erection of 20 WTs VESTAS V52-850kW
  • Wind Farm w/ installed capacity 7.65 MW at ‘Aghios Ioannis-Vroucha’ site, Region of Crete for the company PLASTIKA KRITIS S.A. Procurement and commissioning of 9 WTs VESTAS V52-850 kW.
  • Wind Farm w/ installed capacity 5.95 MW at ‘Voskero’ site, Region of Crete, for the company DOMIKI KRITIS S.A. Procurement and commissioning of 7 WTs VESTAS V52-850 kW.
  • Wind Farm w/ installed capacity 2.64 MW at ‘Syriggas’ site, Island of Syros, for the project company AEOLIKI SYROS S.A. Wind Farm extension permit for a 1.2 MW capacity increase. Procurement, installation supervision, commissioning, operation and maintenance of 4 WTs VESTAS V47-660 kW.
  • Wind Farm w/ installed capacity 11.22 MW at ‘Tsilikoka’ site, Region of Evia, for the company TERNA ENERGY S.A. Procurement, installation supervision and commissioning for the erection of 17 WTs VESTAS V47-660 kW
  • Wind Farm w/ installed capacity 11.22 MW at ‘Prophetes Elias’ site, Region of Evia for the company TERNA ENERGY S.A. Procurement, installation supervision and commissioning for the erection of 17 WTs VESTAS V47-660 kW
  • Wind Farm w/ installed capacity 2.65 MW at ‘Koutsounorachi’ site, Island of Milos for the project company AEOLIKI MILOS S.A. Procurement, installation supervision, commissioning, operation and maintenance of 2 WTs VESTAS V42-600 kW and 2 WTs VESTAS V52-850 kW
  • Wind Farm w/ total installed capacity 3.01 MW at ‘Lavrio’ site, Region of Attica, for the research CENTRE for the RENEWABLE ENERGY SOURCES (CRES). Procurement, foundation, erection, electrical equipment and commissioning of one WT VESTAS V 47-660 kW
  • Wind Farm w/ installed capacity 8.58 MW at ‘Bourlari’ site, Region of Evia for the project company AEOLIKA PARKA of CYCLADES- BOURLARI S.A. Turn-key installation of 13 WTs VESTAS V 47-660 kW
  • Wind Farm w/ installed capacity 450 kW at Karpathos Island for the local Municipal Development Company. Procurement, foundation, erection, electrical equipment and commissioning of 2 WTs VESTAS V 27-225 kW

B. Operational wind farms in collaboration with the Public Power Company (PPC)

  • Wind Farms w/ total installed capacity 8.1 MW at the islands of Andros, Samos, Chios and Psarra. Procurement, installation supervision and commissioning for the erection of 36 WTs VESTAS V27-225 kW
  • Wind Farms w/ installed capacity 3.92 MW at the islands of Karpathos, Samothraki, Ikaria, Limnos, Samos & Chios. Procurement, installation supervision and commissioning for the erection of 24 WTs Windmatic WM 15 S–55 kW and 26 WTs Windmatic WM 19 S-100 kW
  • Wind Farm w/ installed capacity 2 MW at the island of Lesvos. Technical restore, installation and commissioning of 9 WTs VESTAS V27-225 kW
  • Innovative hybrid power system through the installation and operation of a VESTAS V39-500 kW WT coupled with an energy storage module of batteries. The project was funded by the EU through the THERMIE research programme.

The total installed capacity of operational wind farms with ITA participation is estimated at around 260 MW.

C. Under Development Wind Farms

Apart from the operational projects, ITA Group has made lots of studies and surveys (energy, environmental, route, civil, electric, etc) for the development of new Wind Farms in various sites all over Greece (Regions of Crete, Rhodes, Evia, Peloponnese, Cyclades, Epirus, Northern Greece) and Bulgaria. The cumulative installed capacity of these projects (which also include an Offshore Wind Farm) is more than 1.350 MW

D. ITA Participation in Wind Energy Companies

  • ITA is the major shareholder in the following wind energy production companies:
Aeoliki Milos S.A. 2.65 ΜW
Aeoliki Syros S.A. 2.64 ΜW
  • ITA is a shareholder in the following private power production companies in the field of wind energy with a total project development portfolio of 856 MW:
Aeoliki Sidirokastro S.A. 15 MW
Metka Aeoliki Platanos S.A. 5.95ΜW
Mytilineos Aeoliki Neapoli S.A. 8.5MW
Aeoliki Evia Pyrgos S.A. 15.3ΜW
Aeoliki Evia Chelona S.A. 9.35MW
Aeoliki Evia Diakoftis S.A. 11.05ΜW
Aeoliki Evia Pounta S.A. 11.05MW
Aeoliki Andros Tsipovlidi S.A. 27ΜW
Aeoliki Andros Rachi-Ksirokompi S.A. 15.3ΜW
Energeiako Kentro APE Cyclades S.A. 288MW
Pleiades Aeoliki S.A. 450ΜW